itm Header
513.248-8450   |   

info@un-yah.com
 
home | site map | about | contact | feedback

HOME
 HOME
 APPLICATIONS
 SERVICES
 SOLUTIONS
ash-hopper
cfp remote panel
engine test stand
impact test system
operating test system
pneumatic controls
silo level
hardware
 
227 water street suite 300
milford, oh 45150
513.248.8450

Solutions > Ash - Hopper Clinker Detection


Objective: Develop and implement a real-time monitoring system to provide early warning detection for clinker and ash pluggage in a utility boiler fly ash collection hopper.   Instrument Panel
Solution: The solution for monitoring the ash build-up in the collection hopper is based on measuring the loads response of the hoppers support structures as well as the hopper wall temperature differential.  
 

Solution Details: The ash hopper is supported by structural I-beams. The support beams are instrumented with strain gauges to measure the relative change in load carried through the I-beam load path as the amount (level) of ash in the hopper changes. read more: click here ...

 
 

System components include...


  • Strain based instrumentation
  • Thermocouples
  • Remote IO Interface

  • OPC (OLE for process control) server


    General Nav

    Copyright © 2005 Integrated Test & Measurement (itm), LLC.  All rights reserved.